Guide

What does a first article inspection (FAI) report include?

What's inside an FAI, why it matters, and when you need one.

The short answer

A first article inspection (FAI) report documents that the first production part matches every requirement on the drawing. It includes a ballooned drawing, a measured result for every dimension and note, material and process certifications, and a sign-off. Many FAIs follow the AS9102 format. You need one for new part numbers, revisions, and process changes.

Micro Tool Engineering · Riviera Beach, FL · Updated

What's in a typical FAI

  • Ballooned drawing: every characteristic numbered
  • Part accountability: part number, revision, serial or lot
  • Material and special-process certs (heat treat, plating, passivation)
  • Characteristic results: nominal, tolerance, actual measurement, pass/fail
  • Inspection methods and equipment used (CMM, optical, gauges)
  • Approval signatures

When you need an FAI

For a new part number, a drawing revision, a change in process, material source, or location, or after a long production gap.

FAI vs. PPAP

FAI proves the first part is right. PPAP (Production Part Approval Process) is a larger package that proves the process will keep producing it right, with capability studies, process flow, and control plans.

Request a quote

Send us your print.
Get a real answer.

Our engineers review every drawing for manufacturability and return a detailed quote — typically within 48 hours. Confidential, with an NDA on request.

  • NDA on request
  • DFM feedback included
  • Direct line to an engineer
  1. 01
    Send your printCAD, drawing, or photos, plus quantity, material, and budget.
  2. 02
    An engineer reviews itManufacturability feedback and a detailed quote, typically within 48 hours.
  3. 03
    Approve and we buildFirst articles, inspection reports, then repeat production.
Start your quote Or call an engineer: (561) 842-7381

Family-owned since 1968FDA registeredReply in ~48 hrs

Request a quote (561) 842-7381